Triangle 1 - Mining Consultants
Engineering

Engineering

Palaris has an unrivalled track record of delivering engineering solutions to the resources industry for over 20 years. We have specific expertise in mining equipment and infrastructure and provide the full range of life cycle requirements for mines and heavy industry.

A combination of engineering knowledge and operational experience ensures we deliver optimised solutions; practical and compliant for the intended purpose. We know what works and will identify key opportunities, issues and risks from mechanical and electrical engineering perspectives.

Experience Matters

Our knowledge base has been developed through completion of over 900+ engineering projects across Australia. We make it our business to have an in-depth understanding of the engineering related legislation and international best practice. Key members of our team have worked in statutory positions. We know the challenges of engineering in the resources industry and have the capability to deliver innovative, effective and practical solutions.

Palaris has significant experience in leading large scale engineering improvements and developing fit for purpose engineering designs, standards and reliability processes. We have a track record of identifying and defining engineering initiatives unlocking significant value from existing assets.

Our engineering team works in partnership with our risk, safety and automation team who have site-based experience in all facets of mining.

As the one stop shop for feasibility studies, we are the only mining consultants where our mechanical and electrical engineering team work alongside our mine planning team to deliver integrated solutions. This means that we assist our clients past the study phase through to design, bid management, contract negotiation and the installation, commissioning and performance testing of assets.

900+

900+

Total Engineering Projects
600+

600+

Equipment/Infrastructure Optimisation Projects
375+

375+

Risk Assessment/Engineering Compliance Projects
75+

75+

Legal Advisory Projects – Specific Engineering Expert Advice Under Privilege

“Reliable, competent and highly experienced.”

Get in Contact

Feedback from a Project Director from one of Australia's largest metallurgical coal mine producers who was overseeing the final stage of a feasibility study. Our engineering team completed a number of trade off studies which included: the analysis and selection of longwall equipment (new versus overhauled existing), surface longwall pumping systems (to improve longwall uptime, overall cost reduction and reliability enhancement), technology/automation (to improve productivity and safety) and conveyor systems (to improve Development Panel advance and longwall performance).

Triangle 3 - Mining Consultants

Key Team Members

John Snape

John Snape

General Manager Engineering & Project Delivery
John Snape Email John Snape Phone John Snape LinkedIn
Tony Goodwin

Tony Goodwin

Manager Engineering
Tony Goodwin Email Tony Goodwin Phone Tony Goodwin LinkedIn